How to install and operate the German Sun storage Sonnenschein battery? |
Time:2018-11-09 Source:Sonnenschein Views:3294 |
How to install and operate the German Sun storage battery?
German sunlight battery reliable backup performance test, in many occasions, in order to ensure the reliability of the power supply system, periodically check the connection and performance of the battery by partial discharge, or deep discharge to check the holding capacity of the battery. Discharge testing has limitations and risks, which require manual participation, and has a great impact on the life of German sunlight batteries. Relevant regulations of electric power require regular capacity checking discharge of storage batteries, but in practice, most of them still discharge only 30%-50%. Some UPS designs have automatic discharge function, that is, start testing function according to a certain period.
We are the designated agent of German Sunshine Battery Company, which integrates sales, installation and maintenance services. We take every customer seriously with high efficiency and good business ethics, and really let every customer have no worries.
Germany solar battery installation matters needing attention:
1, according to the principle of standing upright in the upper and lower directions, it is forbidden to use inverted UPS batteries.
2, do not give unusual vibration and impact on Panasonic UPS battery.
3, attention should be paid to insulation during installation.
4, do not install the machine into a closed structure.
5, in the installation process, we should pay attention to keeping a certain distance between batteries to ensure air circulation.
6, please do not mix different kinds of Panasonic UPS batteries.
7, do not expose German solar batteries to organic solvents.
About warranty: 12 V24AH or more for three years, one year for solar system and three years for UPS power system. (remarks: non human)
|
|